REFURBISHMENT OF CONFERENCE ROOM VP CABIN AND AVP ROOMS

 

ITEM

DESCRIPTION

UNIT

QTY

UNIT RATE

AMOUNT

(RO)

 

A.

 

 

CONFERENCE ROOM

 

 

 

 

 

a.

Demolish Existing tiles for the floor area.  (7 x 4 )

SQM

28

 

 

b.

Installation of new porcelain 60 x 60 tiles  (As per approval)

SQM

28

 

 

C

False ceiling greed ( 60 x 60) (7 x 4 )

SQM

28

 

 

d.

Led lights. (60 x 60)

No’s

 

6.00

 

 

e.

Inside  the conference room  one side fix with gypsum sheet (3.9 x 1.10 )

SQM

4.29

 

 

 

B.

 

V.P CABIN

 

 

 

 

 

a.

Demolish Existing tiles for the floor area.  (4 x 4 )

SQM

16

 

 

b.

 

Installation of new porcelain 60 x 60 tiles with  (As per approval)

SQM

16

 

 

c.

Gypsum work for the ceiling area and lighting work for the ceiling area (design as per approval).

SQM

 

16

 

 

d.

1 side aluminum frame inside VP room is to be closed with gypsum sheet. (3.8 x 2.20 ) SQM

SQM

8.36

 

 

e.

Touching up of center wall partition with gypsum sheet to ceiling inside VP room. ( 8 X 1) SQM

SQM

8

 

 

f.

Only installation of one aluminum frame door. (door will provide school)

No’s

 

1

 

 

 

C.

 

WAITING AREA

 

 

 

 

 

a.

Demolish Existing tiles for the floor area.  (4 x 3.2 )

SQM

12.8

 

 

b.

 

Installation of new porcelain 60 x 60 tiles (As per approval)

SQM

12.8

 

 

c

False ceiling greed ( 60 x 60) (4 x 3.2 )SQM

SQM

12.8

 

 

d.

Led lights. (60 x 60)

No’s

2

 

 

 

D.

 

AVP CABINS

 

 

 

 

 

a.

Demolish the room made of gypsum sheet and remove the waist.

(Only partitions wall)

 

 

 

 

           b.

False ceiling greed ( 60 x 60)  (8.10 X 7.10) sqm

SQM

57.51

 

 

c.

Touching up of center wall partition with gypsum sheet to ceiling inside AVP room. ( 35.2 x 1.10 )sqm

SQM

38.72

 

 

           d.

Led light 60 x 60

No’s

10

 

 

NOTE:

  1. All the quantities to be measured by the contractor and the final invoice will be certified as per the actual quantities
  2.  Waste removal cleaning and disposed (Contractor).
  3. For further and accurate Information for visit site.

 

 

 

DATE:16-05-2023

DATE:07-05-2023

DATE:28-02-2023

DATE:21-02-2023

 

DATE:20-02-2023

DATE:30-01-2023

DATE:17-12-2022

DATE:19-10-2022

 

DATE:08-10-2022

 

DATE:13-07-2022

DATE:08-06-2022

The submission of tender is extended till Saturday 18/6/2022.

 

DATE:15-05-2022

DATE:05-04-2022

DATE:22-03-2022

Web-link for Various requirements

 

DATE:20-03-2022

 

DATE:13-03-2022

DATE:28-02-2022

 

DATE:13-01-2022

 

DATE:12-01-2022

 

DATE: 29-12-2021

 

DATE: 26-12-2021

 

DATE: 15-12-2021

 

DATE: 22-11-2021

======================================================================================================================

DATE: 27-10-2021

======================================================================================================================

DATE: 26-10-2021

======================================================================================================================

DATE: 14-10-2021

 

Icon